Quote Number | QUO-7451 |
Quote Date | January 20, 2022 |
Total | $18,245.25 |
10-135 W. NORTHWEST HWY
BARRINGTON, IL60610
Scope of work:
- Remove existing condenser unit
-Cut out and install unit roof adaptor curb
-Install new RTU unit
-Install ductwork distribution, one main round spiral branch 22 ga. starting at 14" and reducing to 8", approximately 40 feet long.
-Install one main air return at the unit location.
-Install temperature control low voltage wiring, install temperature control.
Exclusions- Permits and fees, load calculation and engineering, electrical and gas supply to the equipment.
Note- electrical and gas supply must be present within 5 ft of the equipment for us to make the final connections.
Hrs/Qty | Service | Rate/Price | Adjust | Sub Total |
---|---|---|---|---|
1 | 4.5 Ton Carrier TECECDSRT12CBD2DH |
$6,321.78 | 0% | $6,321.78 |
1 | Unit roof curb adaptor |
$1,628.45 | 0% | $1,628.45 |
1 | Unit installation labor |
$2,600.00 | 0% | $2,600.00 |
1 | Crane service ( estimated) |
$1,200.00 | 0% | $1,200.00 |
1 | Ductwork layout materials ( estimated) |
$2,500.00 | 0% | $2,500.00 |
1 | Ductwork installation labor |
$2,500.00 | 0% | $2,500.00 |
1 | Equipment Delivery | $450.00 | 0.00% | $450.00 |
Sub Total | $17,200.23 |
Tax | $1,045.02 |
Total | $18,245.25 |